Dear
Partners,
We inform
you, that the crane is now operating, the service is ongoing.
Thank you
for your kind patience.
RCT-BILK
Dear
Partners,
Hereby we
would like to inform you that due to technical breakdown the service with crane
is temporarily suspended, containers positioned under the crane track area
cannot be picked up.
Services
from other areas of the Terminal (drop off/pick up) are handled by our
reachstackers, road arriving drop offs, depot related traffics and all other
services are provided in this way.
Please
notify your partners/subcontractors and plan your activities accordingly.
We will
keep you updated.
Dear Partners,
Hereby we inform you that due to reconstruction
works of the main railway line nr 150 (connecting Belgrade to Budapest),
according to our prior information, on 11/05/2024 and 18/05/2024 (Saturday)
between 09:00 a.m. and 05:00 p.m., the rail traffic between
Ferencváros Station és Soroksár Terminál Station will be suspended. Within the
indicated period Rail Cargo Terminal - BILK will not be able to accept
and dispatch trains, therefore delays in rail traffic can be expected.
During the above mentioned period the road
service will be continuous, no interruptions are expected.
The customer service will operate according to
the usual Saturday opening hours. The cash desk will be closed.
Please take into account the above mentioned
while planning.
Thank you for your kind cooperation and understanding.
Dear
Partners,
As we have
already informed you from 1 September 2023, Rail Cargo Terminal - BILK Zrt. has
introduced stricter security and loading conditions for drivers, which they
were temporarily required to declare in writing upon each entry.
Hereby we
would like to inform you that from 30 October 2023, the occasional declarations
will be replaced by an online training platform, available in 9
languages, which will enable drivers to learn about the safety and loading
rules in force at Rail Cargo Terminal - BILK Zrt. The chapters will be followed
by a short quiz and after passing the test, the driver will receive a QR code
to enter the terminal area.
The code is
valid for one year, so access needs to be renewed annually.
The system
is also able to send information directly to the drivers, so in the future we
will use this platform as a communicational channel to notify drivers in case
of any extraordinary event at the terminal.
During the
testing period the two access methods will work in parallel, but from 1 January
2024, drivers will only be able to enter the terminal with
a valid QR code.
The online
security and loading information is available on the following website: https://www.intasite.com/kiosk/rail-cargo-terminal-bilk/
Registration
is required to access the online training platform.
Should any problem arise while using the system, please send an e-mail to gatesecurity.rct.bilk@railcargo.com
Dear Partners,
Hereby we inform you that due to reconstruction
works of the main railway line nr 150 (connecting Belgrade to Budapest),
according to our prior information, from 00:00 a.m. 25.10.2023 till 11:59
p.m. 28.10.2023, the rail traffic between Ferencváros Station és Soroksár
Terminál Station will be suspended. Within the indicated period Rail Cargo
Terminal - BILK will not be able to accept and dispatch trains.
During the above mentioned period the road
service will be continuous.
The customer service and cash desk will operate
according to the general opening hours.
Please take into account the above mentioned
while planning the drop-off and pick-up of the containers.
Thank you for your kind cooperation and understanding.